﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0"><channel><title>alpha-ndt.com</title><link>http://alpha-ndt.com</link><description>Alpha NDT Inspection</description><copyright>Copyright 2011 alpha-ndt.com All rights reserved.</copyright><generator>Alpha-ndt.com:http://alpha-ndt.com</generator><pubDate>Thu, 23 Feb 2012 07:14:57 GMT</pubDate><item><title>Ndt for refrigerated storage</title><description>&lt;a href="http://alpha-ndt.com/OurProject/OurProjects.aspx?id=343"&gt;&lt;img src="http://alpha-ndt.com/Upload/Bon .jpg"&gt;&lt;/a&gt;Presently, AlphaNDT have been performing NDT for refrigerated storage fabrication which executed by ECC at its workshop.The work has been conducted in according to ASME 8 code and under supervision of PVGas.</description><link>http://alpha-ndt.com/News/News.aspx?id=343</link><pubDate>Tue, 21 Feb 2012 10:13:09 GMT</pubDate></item><item><title>Alphandt celebrate its 10-year anniversary</title><description>&lt;a href="http://alpha-ndt.com/OurProject/OurProjects.aspx?id=342"&gt;&lt;img src="http://alpha-ndt.com/Upload/"&gt;&lt;/a&gt;On 7th January, AlphaNDT conducted the 10-year anniversary of foundation with great pride of all Company’s members at Vung Tau City, its permanent project location during last 10 years.</description><link>http://alpha-ndt.com/News/News.aspx?id=342</link><pubDate>Mon, 09 Jan 2012 15:02:03 GMT</pubDate></item><item><title>Ndt for phnom penh sugar, cambodia</title><description>&lt;a href="http://alpha-ndt.com/OurProject/OurProjects.aspx?id=341"&gt;&lt;img src="http://alpha-ndt.com/Upload/sutech 1.jpg"&gt;&lt;/a&gt;Recently, AlphaNDT have executed RT service for boiler and piping at Phnom penh Sugar in Cambodia due to the assignation from Sutech Engineering Company which have developed its production capacity of industrial machineries for sugar mills, paper pulp factories and cement factories.</description><link>http://alpha-ndt.com/News/News.aspx?id=341</link><pubDate>Sat, 03 Dec 2011 09:19:39 GMT</pubDate></item><item><title>Paut performance for pipeline of bien dong 1 project</title><description>&lt;a href="http://alpha-ndt.com/OurProject/OurProjects.aspx?id=340"&gt;&lt;img src="http://alpha-ndt.com/Upload/Thai Lan 3.jpg"&gt;&lt;/a&gt;Due to the assignation from Petroleum Offshore Trading and Services Company (POTS), AlphaNDT have presently carried out Phased Array Ultrasonic Testing (PAUT) for pipeline fabrication of Bien Dong 1 project at Canadoil workshop in Thai Land. The PAUT method has been applied for Long seam clad line pipe (L-Seam) and jointer circumferential welds (C-seam) of the pipeline under supervision of Canadoil workshop, Bien Dong POC and POTS. </description><link>http://alpha-ndt.com/News/News.aspx?id=340</link><pubDate>Wed, 23 Nov 2011 14:01:15 GMT</pubDate></item><item><title>Alphandt to start ndt provision for mong duong 2 coal fired power plant</title><description>&lt;a href="http://alpha-ndt.com/OurProject/OurProjects.aspx?id=339"&gt;&lt;img src="http://alpha-ndt.com/Upload/Vietnam_Mot.jpg"&gt;&lt;/a&gt;Presently, AlphaNDT have just deployed NDT services for Mong Duong 2 Coal Fired Power Plant due to contract awarded from Doosan Heavy Industries Viet Nam, EPC Contractor of the Project which owned by the joint venture between AES and VINACOMIN.</description><link>http://alpha-ndt.com/News/News.aspx?id=339</link><pubDate>Tue, 22 Nov 2011 14:17:57 GMT</pubDate></item></channel></rss>
